etac Project

TAC Technology is adopted to the tunnel construction in Netherlands!


Botlekspoortunnel (Holland) adopts the technology of TAC!

Local :
Rotterdam suburbs
A south Holland state the Netherlands country

Tunnel extension :
1835m.



Feature :
We developed the automatic simultaneous back fill grouting system which carries out the liquid type Thixotropical-gel Grouting Method like grouting material using 1 liquid type simultaneous grouting pipe of the Europe style .

Consequently, the outstanding construction nature and the outstanding settlement control effect were esteemed highly.